New Freeway Exit Construction Cost

For the fastest response to technical questions or requesting assistance please contact Estimates Systems Support.

Disclaimer: These models are generic in nature, and not based on actual construction projects. They are for reference purposes only, and are not intended to predict or support future estimates.

Model Types/Groups: Rural, Urban, Suburban, Other, Bridges

    Model Cost per Mile Composite Report
    Rural
    New Construction Undivided 2 Lane Rural Road
    with 5' Paved Shoulders: R01

    $2,546,993.64

    Composite Report
    New Construction Undivided 3 Lane Rural Road
    with 5' Paved Shoulders, Center Turn Lane: R02

    $3,091,693.93

    Composite Report
    New Construction Undivided 4 Lane Rural Road
    with 5' Paved Shoulders: R03

    $3,649,480.40

    Composite Report
    New Construction, 4 Lane Divided Rural Road
    with 2' Paved Shoulders Inside and 5' Paved Shoulders Outside: R04

    $5,088,824.60

    Composite Report
    New Construction Divided Rural 4 Lane Interstate
    with Paved Shoulders 10' Outside and 4' Inside: R05

    $6,433,556.63

    Composite Report
    New Construction Undivided 5 Lane Rural Road
    with 5' Paved Shoulders, Center Turn Lane : R06

    $4,327,381.81

    Composite Report
    New Construction, 6 Lane Divided Rural Road
    with 5' Paved Shoulders Inside and Out: R07

    $6,160,611.11

    Composite Report
    New Construction Divided Rural 6 Lane Interstate
    with 10' Paved Shoulders Inside and Out: R08

    $7,529,958.11

    Composite Report
    New Construction Extra Cost for 1 Single Additional Lane on Rural Arterial: R09

    $567,700.52

    Composite Report
    New Construction Extra Cost for 1 Single Additional Lane on a Rural Interstate: R10

    $667,532.16

    Composite Report
    Milling and Resurfacing 2 Lane Rural Road
    with 5' Paved Shoulders: R11

    $478,977.22

    Composite Report
    Milling and Resurfacing 3 Lane Rural Road
    with 5' Paved Shoulders and Center Turn Lane: R12

    $668,889.65

    Composite Report
    Milling and Resurfacing 4 Lane Rural Road
    with 5' Paved Shoulders: R13

    $1,034,518.59

    Composite Report
    Mill and Resurface 4 Lane Divided Rural Arterial
    with 5' Outside Shoulders and 2' Inside: R14

    $1,088,878.27

    Composite Report
    Mill and Resurface 4 Lane Divided Rural Interstate
    with Paved Shoulders 10' Outside and 4' Inside: R15

    $1,284,941.77

    Composite Report
    Milling and Resurfacing 5 Lane Rural Road
    with 5' Paved Shoulders and Center Turn Lane: R16

    $1,245,664.51

    Composite Report
    Mill and Resurface 6 Lane Divided Rural Arterial
    with 5' Paved Shoulders Inside and Out: R17

    $1,551,489.10

    Composite Report
    Mill and Resurface 6 Lane Divided Rural Interstate
    with 10' Paved Shoulders Inside and Out: R18

    $1,829,087.24

    Composite Report
    Mill and Resurface 1 Additional Lane Rural Interstate: R19

    $294,208.37

    Composite Report
    Mill and Resurface 1 Additional Lane Rural Arterial: R20

    $240,698.62

    Composite Report
    Widen Existing 2 Lane Arterial to 4 Lanes Undivided;
    Add 1 Lane to Each Side; 5' Paved Shoulders: R21

    $2,815,021.83

    Composite Report
    Widen Existing 2 Lane Arterial to 4 Lane Divided;
    Resurface Existing 2 Lanes; 5' Paved Shoulders Inside and Out: R22

    $3,264,515.17

    Composite Report
    Widen Existing 4 Lane Divided Arterial to 6 Lane Divided;
    Resurface Existing 4 Lanes; 5' Paved Shoulders Inside and Out: R23

    $3,133,423.67

    Composite Report
    Widen 4 Lane Interstate to 6 Lanes (In Median);
    Mill and Resurface Existing; 10' Paved Shoulders Inside and Out: R24

    $4,695,688.41

    Composite Report
    Widen 4 Lane Interstate to 6 Lanes (Outside);
    Mill and Resurface Existing; 10' Shoulders Outside;
    Widen Existing 4' Inside Shoulders to 10': R25

    $4,276,327.16

    Composite Report
    Widen Existing 6 Lane Divided Arterial to 8 Lane Divided;
    Resurface Existing 6 Lanes; 5' Paved Shoulders Inside and Out: R26

    $3,434,380.44

    Composite Report
    Widen 6 Lane Interstate to 8 Lanes (in Median);
    Mill and Resurface Existing; 10' Paved Shoulders Inside and Out: R27

    $5,173,763.91

    Composite Report
    Widen Divided Rural 4-Lane to Allow for Left Turn Lane, 300' :R28

    $172,134.71

    Composite Report
    Widen Divided Rural 4-Lane for Right Turn Lane, 300' :R29

    $169,383.18

    Composite Report
    Urban
    New Construction 2 Lane Undivided Urban Arterial with 4' Bike Lanes: U01

    $4,285,161.73

    Composite Report
    New Construction 3 Lane Undivided Urban Arterial
    with Center Lane and 4' Bike Lanes: U02

    $4,838,900.28

    Composite Report
    New Construction Undivided Urban Arterial
    with 4' Bike Lanes : U03

    $5,263,198.95

    Composite Report
    New Construction 4 Lane Urban Road with 22' Median and 4' Bike Lanes: U05

    $8,203,526.28

    Composite Report
    New Construction 4 Lane Divided Urban Interstate,
    Closed 22' Median with Barrier Wall, 10' Shoulders Inside and Out U06

    $13,214,021.59

    Composite Report
    New Construction 5 Lane Undivided Urban Arterial
    with Center Turn Lane and 4' Bike Lanes: U07

    $6,106,970.11

    Composite Report
    New Construction 6 Lane Urban Road with 22' Median and 4' Bike Lanes: U08

    $9,009,892.98

    Composite Report
    New Construction Divided Urban 6 Lane Interstate
    with 22' Closed Median with Barrier Wall, 10' Shoulders Inside and Out: U09

    $14,213,805.09

    Composite Report
    New Construction Extra Cost for Additional Lane on Urban Arterial: U10

    $1,431,542.69

    Composite Report
    New Construction Extra Cost for Additional Lane on Urban Interstate: U11

    $711,192.49

    Composite Report
    Mill and Resurface 2 Lane Urban Road with 4' Bike Lanes: U12

    $553,956.74

    Composite Report
    Mill & Resurface 3 Lane Urban Road
    with Center Turn Lane and 4' Bike Lanes: U13

    $726,874.96

    Composite Report
    Mill and Resurface 4 Lane Undivided Urban Roadway with 4' Bike Lanes: U14

    $993,520.52

    Composite Report
    Mill and Resurface 4 Lane Divided Urban Roadway with 4' Bike Lanes: U15

    $1,168,960.70

    Composite Report
    Mill and Resurface 5 Lane Urban Roadway with Center Turn Lane and 4' Bike Lanes: U16

    $1,167,008.17

    Composite Report
    Mill & Resurface 6 Lane Divided Urban Arterial with 4' Bike Lanes: U17

    $1,663,983.80

    Composite Report
    Mill and Resurface 1 Additional Lane Urban Arterial: U18

    $277,126.24

    Composite Report
    Add 2 Lanes to Existing 2 Lane Undivided Arterial (1 Lane Each Side), with 4' Bike Lanes: U19

    $4,884,812.98

    Composite Report
    Widen 2 Lane Urban Arterial to 4 Lane Divided with 22' Median, 4' Bike Lanes: U20

    $5,480,586.42

    Composite Report
    Add 2 Lanes to Existing 3 Lane Undivided Arterial (1 Lane Each Side with Center Turn Lane and 4' Bike Lanes: U21

    $5,038,671.14

    Composite Report
    Widen 4 Lane Urban Divided Arterial to 6 Lane Urban Divided with 22' Median and 4' Bike Lanes: U22

    $4,954,841.91

    Composite Report
    Widen 4 Lane Urban Interstate with Closed Median to 6 Lanes (Outside), Mill and Resurface Existing, 10' Shoulders Outside: U23

    $9,679,599.76

    Composite Report
    Widen 6 Lane Urban Divided Arterial to 8 Lane Urban Divided with 4' Bike Lanes: U24

    $6,004,966.83

    Composite Report
    Widen 6 Lane Urban Interstate with Closed Median to 8 Lanes (Outside); Mill and Resurface Existing; 10' Shoulders Outside: U25

    $10,361,654.99

    Composite Report
    Suburban
    New Construction Suburban 4 Lane with Paved Shoulders Outside and Curb Median: S01

    $5,022,624.57

    Composite Report
    Widen Existing Rural Facility to the Inside
    with Addition of Closed Drainage System and Median Barrier Wall: S02

    $3,423,890.81

    Composite Report
    Widen 4 Lane Suburban Roadway with 6.5' Paved Shoulder and Convert to C&G Out;
    Stripe for Bike Lane: S03

    $2,942,935.76

    Composite Report
    Add 2 Lanes with C&G Out to Existing 4 Lane Urban
    or Suburban Roadway with C&G Out: S04

    $3,046,554.11

    Composite Report
    Other
    Two Directional, 12' Shared Use Path: O01

    $344,768.94

    Composite Report
    Rails to Trails project (12' width): O02

    $324,466.71

    Composite Report
    Sidewalk construction; 5' one side, 4 inch depth: O03

    $180,232.85

    Composite Report
    Mid-Block Crossing: O05

    $152,764.67

    Composite Report
    Bridges Varies See Vol. 1 Chapter 9 of the
    Structures Design Guidelines
    for guidance on estimating Bridge costs.

Source: https://www.fdot.gov/programmanagement/estimates/lre/costpermilemodels/cpmsummary.shtm